1. Stock off @ 8A.M.
2. Chests at 50%
3. Flush the DeInk chest with 10,000 gallons from pulp mill
4. Remove the guards from both sides of the felt.
5. A Fuji film will be performed on the suction pressure roll.
6. Stop machine
7. Put suction pressure roll in maintenance position
8. Yankee in Sunday drive
9. Cut the felt off after Fuji film impression
10. Wash the entire machine
11. Dump the WW chest while washing up
12. Install felt #30134312-10 and wire #30129478-10
13. Contact pulp mill when W.W. chest is ready to be filled
14. Clean the rust off the beam under the dampers
No comments:
Post a Comment