Here is a list of things that were done on today’s shutdown.
· Changed the felt
· Changed the Suction Pressure roll
· Changed the Bird screen outer basket
· Changed the Uhle box strips
· Cleaned the white water chests
· Cleaned the Headbox return to white water chest pipe
· Removed the felt flooded nip shower
· Adjusted the press wipe
· Fixed both leaks on spray boom supply pumps
· Fired up vacuum pump # 3. We are running on #1 and #3
· Opened up #2 refiner and checked / cleaned it
· Installed a new brake pad on the reel section
Give me a call if you have any questions. Gary
No comments:
Post a Comment