Notes from today’s shutdown
· Changed the felt
· Installed the new knock off shower on the wire
· Installed a tensioner on the D/S of the press roll dr
· Inspected and cleaned the refiners
· Slitter maintenance was done
· Adjusted the dry end hood away from the Yankee
· Profiled the creping Dr
· Changed the breast roll
· Adjusted the breast roll closer to the forming roll on the drive side
· Lowered the slice
· Opened the headbox and checked the lexan sheet
· Sanded the Yankee
· Operator PM’s were completed
· Scanner maintenance was done
· Vacuumed the white water chest
Call if you have any questions-Gary
No comments:
Post a Comment