1. Slitters-E&I
2. Open HBX and doghouse – TM
3. Clean up backside of machine and piping – TM
4. Force crepe oscillator to move and install gearbox and motor – Maint.
5. Rewire crepe oscillator - E&I
6. Coating skid stator replacement – TM
7. Switch out 1/2" hose on coating feed to 3/4" - TM
8. Confirmation of core setup dismantle project – E&I
9. Check broke pulper exhaust clean shower – E&I/Maint.
10. Wire Breaker T.S. Bearing – Maint.
11. Work on reel section gates/fence – E&I/TM
12. hardline vacuum sump suction lines - KAL
13. Check suction pressure roll arm dismantle possible issues – Maint.
14. Rotate wire flooded nip to be in nip and not on roll – TM
15. Suck out vacuum sump - KAL