Production Scedule Between Now and the Grind

Please remain on 78" and 25-7/8" trim until the shutdown Sunday evening.
The schedule will be updated tomorrow

Have a safe weekend

Mike Sherbak
Posted by Michael Sherbak at 7:45 PM

No comments:

Post a Comment

Newer Post Older Post Home
Subscribe to: Post Comments (Atom)

AST Links

  • AST Pulp Mill
    We will not be running 207 until Tuesday!
    15 years ago

Blog Archive

  • ►  2012 (1)
    • ►  June (1)
  • ▼  2011 (55)
    • ►  April (2)
    • ►  March (20)
    • ►  February (17)
    • ▼  January (16)
      • Stock flow transmitters
      • Grade Change
      • Yankee gear box oil level
      • Creping blade oscillator
      • Phone list
      • Wire change
      • test
      • Production Scedule Between Now and the Grind
      • Results of the Yankee Dryer Gearbox Boroscope Insp...
      • Shutdown List
      • Production Schedule
      • Yankee Gearbox
      • Crepe Edge Bleed
      • DuBois
      • Final Total Tons For December
      • 2010 is in the record books, Looking ahead into 2011
  • ►  2010 (118)
    • ►  December (27)
    • ►  November (26)
    • ►  October (13)
    • ►  September (15)
    • ►  August (12)
    • ►  July (8)
    • ►  June (7)
    • ►  May (10)
Awesome Inc. theme. Powered by Blogger.