Tuesday, January 4, 2011

Production Schedule

Please run the 33.875” P.O. 021947 until there is 25 tons left.  Just run the 29.875” P.O. over until we finish the 33.875”.  Then move over to the 78” and the 25.875” cut.  This should happen around 11:00 PM.



__________ Information from ESET NOD32 Antivirus, version of virus signature database 5760 (20110104) __________

The message was checked by ESET NOD32 Antivirus.

http://www.eset.com

No comments:

Post a Comment