11/23/2010 Repair day

Notes from todays shutdown.

Changed felt (Albany)

Changed the wire to the 109 trim bead

Lowered the slice from .350 to .276

Soda blasted the Yankee head bolts

Checked the bird screen basket (some damage was found)

Vacuumed the silo

Slitter maintenance was done

Profiled the creping Dr.

New felt and wire guide paddles were installed

The tail cutter track was cleaned

Changed breast roll

Rebuilt the felt stretch roll gear box

Operator PMs were done

The computer table in the control room was raised

 