Tuesday, May 18, 2010

Shutdown For 5/19

7 AM                     ASNA aim & set up

8 AM-12PM        Shoot and adjust DE foils

12 PM                   Sheet on reel

·         Drain and vacuum WW

·         Isolate and sewer condensate-keep warm up

·         Clean up dry end

·         Remove wire and change Breast roll

·         Reel PM-E/I

·         Secondary  arm rod ends-KAL

·         KAL broke pulper 8” line

·         HP shower weld repair

·         B/C consistency Dilution control

·         Δ condensate level control valve

·         TS wire stretcher screw jack

·         Reinstall cross shaft on wire stretcher

 

No comments:

Post a Comment